Skip to main content

Search the Special Collections and Archives Portal

upr000256 268

Image

File
Download upr000256-268.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000256-268
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Lae Vegas - August 15* If52 Mr. L. ?. Peart ** Omaha ©el Mr, 1., L. Adamson * Following is closeout data, 1# 676 cohering construction #f water transmission line to serve lest Side District, Las Vegas, ficvada, Description of work performed, which was commenced September 6f If51 and completed July 7, If52 is as follows? merit of adjustments, f© complete accounting, there should be added the cost of 36 LF of 12“ oast iron pip© furnished by Water Service Department at Las Vegas as covered by Shipping notice Bo. S, dated February 6, If52 which had been ordered for m % p # on Requisition 64~126, dated May 17, 1951, flti fo the cost of the 12“ pipe line should be added the cost of the 36 LF of 12“ Cast Iron pipe furnished by the Railroad Oaisp&ny above referred to. Attached to Sr* Adamson*s copy is print showing Constructed ?2 LF of lb* 1321 LF of 12* 2605 LF of 10* and 136! LF of I® cast iron water line and 25 LF if 6* cast Iron fire hydrant connections* Setall of charges is attached together with state- I the inclusive of the above charges WO 6?6 will be financially complete* lata for depreciate pur use® is as follows? 6* Cast iron pip# line 25 LF fetal #26867.51 location of pipe line constructed for use in preparing *A0* Prints*