Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
More Info
Rights
Digital Provenance
Publisher
Transcription
1 2 3 4 5 6 7 8 9 10 11 12 1 3 1 4 1 5 1 6 1 7 1 8 1 9 20 21 22 2 3 2 4 2 5 2 6 The said contract shall sis# provide that when the work referred t© in subparagraphs (a) to ( f ) of this Soot Ion f shall have boon ©omplated, contractor shall remove tit# following pipe line* and wire lines, store all salvageable material therefrom at a point designated I n said contract and restore the surface of the lands of the pailroad Companies to the condition existing prior to the removal thereof! (h) That certain pipe line shown in broken black and white line between points KE and IX, on said inhibit ®A”. (i) That certain pipe line shown in broken black and white line between points IX and JX on said Exhibit "A*. f|| fhese certain three-wire power lines shown in broken black and green line between points AA and BB end between points pp and HE on said Exhibit BA % (k) Those certain six-wire power lines, two-wire telephone circuits and two telemeter wires shown in broken black and green lines between points and #S on said Exhibit *A*. The cost t© First parties of the work referred to in this section shall be deemed to be the amount paid by First Parties to the contractor under and pursuant to sa'llid contract or contracts plus ten percent (10*5) thereof for supervision and engineering furnished by First Parties in connection with the work B