Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
5/23/43 Cemented y7b,$U* o f new blank 10-3/4" - 35*75# A. 0. Smith, 3 round thread lin e r with shoe at 620. Top o f lin e r at 443.16. From bottom up lin e r I s made up as fo llo w s: 371.44* o f blank {in c lu d in g 1 .63* Baker cement flo a t shoe on bottom), then 5*40’ Baash-Ross p la in lin e r hanger. 10-3/4" shoe at 320 cemented with 160 sacks cement (1 st 40 sacks V ic to r M odified, then 30 sacks R iverside Portlan d, then 40 sacks V ic to r M o d ifie d ), none treated, fop o f cement behind casing at 4 4 3 .16. Cement was pumped down through 4-1/2* upset d r i l l pipe with swab assembly on bottom hung at 8G5» leavin g a 15* plug in the casing. A fte r d isp la c in g the eemftnt, p u lled up to 421 and circ u la te d out excess cement. Finished pumping down cement at 9*21 A.M ., May 23rd. W ell stood cemented J1 hours. 5/24/42 Cleaned out to 448 (5* below top o f 10-3/4* lin e r ) and put pressure o f I 65 l b s . , with pumps on flu id in hole at 10:29 P.M. March 24th, pressure dropped to 100# at 10:44 P.M. (a 65# drop in 15 m inutes). Pressure drop was due to a leak in a valve. In try in g to b u ild pressure above 16 5 # pumps would be s ta lle d . Cement in overlap between 10-3/4" and 1 3 * 3/4 " casings held Q.M. 5/25/42 At 3:00 P ,M ., May 2 5 th, with hole cleaned out to 325 {5 ’ below 10-3/4" shoe) made tes,t o f 10-3/4" shoe as fo llo w s: Set 4|" upset d r i l l pipe with swab assembly on bottom (swabs fac in g' downward) at 794« Pumped in 190 cu. f t . o f water through d r i l l pipe to displace mud flu id in the d r i l l pipe and the casing below. In pumping in the water a few strokes o f the pomp would gause the pressure to Jump to 400#. Pressure would then gradu ally drop to 350# and hold at that pressure. Test showed that cement job on 10-3/4" shoe wa6 holding O.K. 5/26/42 Cleaned hole to bottom with 9-5/8" Crum b it . Plugged bottom | o f hole from 1250 up to ll6 0 with 80 sacks o f R iverside | Portland cement, none treated. Cemented pumped in through 4&* * d r i l l pipe with 9*5/8" Crum, b it on bottom hanging at 1248. A fte r pumping down cement, p u lled b it up to 1150 and circu lated out excess cement. Cement mixed by r i g 's crew and pumped down by r i g 's pumps. Finished cementing at 4 :4 4 A.M. on May 26th. Hole stood cemented 12 hours. Ran in and f e l t fo r top 0# cement plug. P lu g took weight o f d r i l l pipe at 1157. Set 358.86* o f new 7" 0. B. - 24# A. 0 . Smith seamless, 8 round thread, co llared lin e r with shoe on top o f cement plug at H 5 7 . 4 6 . C. P. at 1094.08. Top o f lin e r (in c lu d in g se ttin g mandrel) at 7 9 8 . 60. From bottom up lin e r i s made up as fo llo w s: 61.38* o f perforated (in c lu d in g shoe which consisted o f welding bottom o f bottom jo in t closed to form guide shoe)j 6.70 Baker cement w h irle r flo a t c o lla r with s o lid bottom b a ff le and canvas basket, then 69*52' blank, then 219*31*