Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
\ m i m p a c if ic n m m & m LA® VE0A3, BSVADA Location: l i l t r w e l l 1 ^ * 3 8 1 I h L *^**5 and II®®* Vest fron i§ corner, Section 31, SQ**wXp M »2*l3#&ll* Spudded at 10800 A.M., April 1, 1942 D rilled 18-1/4* bole to 319 on April 2, 1942 4-2-42 Started running 13-3/®* rasing at 4820 P.2, shoe of *f*“ ®/®* stopped at 43.6. Started pulling aaeing out of hole at 9:00 P.M., April 2 4-3-42 Beared hole with 19-1/4* Crus h it to bettor. Measured out* Corrected button vac 318. Ban 292.32* (8 Joints) of 13-3/8* - 48# South Choeter Tube 6o*e lapveld abort thread 8-V thread oaaing in hole. Centoted 13- 3/®* shoe at 280.22 ueing 228 eaahe Victor Modified Cement. Pone treated. Ceaent nixed and pulped down by the rige pumps and crew, two Perkin* plugs used. Baker ceaent flo a t ehoa on botton of aaeing. started running easing at 6:40 A.M. ) Finished running easing at 10:30 A.M. } 3 hrs., 90 nin. started nixing cement at 10:88 a .m. j Finished nixing oenent at 11:26 A.M. } 31 nin. started punping down ceaent at 11:32 A.M.) Plugs burped at 11:4? A.M. ) 18 nin. Finished oenent Job at 11:4? A.M. April 3, 1942. Veil stood eeaeated 36 hours. 4-5-42 Ban in, found top of oonent and plugs at 2 ? ? . Drilled out 13-3/8* shoo at 12 midnight of April 3rd. DrIliad ahead to 364. h ilt d rillin g at 364 at 8:16 A.M., April 5th, wall started flowing water, well flowed free ly until gate was installed. Well was then closed in at 1:00 P.M., tho aant day. was k illed at 11:48 P.M. with rad. Veil renainad deed fron 11:48 P.M. April 6th until ?:46 A.M., April 6th 4-6-42 While preparing to run in with the d r ill pipe at ?i48 A.M., well started flowing again. The gate was again installed. The well wee than allowed to flow through tho gate while the UPRROo. node a tent of the enount of flew with their wler. The wler showed a flow of 6-8/6* equal te 1238 gallons perminute. Tho pressure at the top of the well when closed in was 22.6 lbe. The well was again k illed with rad at 11:30 P.K., April 8th. Veil stood killed with nod fron 11:30 P.M., April 6th to 8:00 A.M., April loth.