Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
Water Well. #4 H istory UN IO N P A C IF IC RAILROAD COMPANY L a s V e g a s , N e v a d a Location: North. 500* West o f the East Quarter corner Section JL, 20-61, M. i f B. & ®. Spudded 4/25/40 4/26/40 4/27/40 4/28/40 4/29/40 4/30/40 II 1/40) 5/ 2/40 ) 11 3/40 5/ 4/40 5/ 5/40 at 3:00 P. M., A p ril 25, 1940 Spudded at 3:00 P. M .; d r ille d 34* o f 15-1/8" hole Reamed 15-1/8” hole from 0 to 34’ &ud d r ille d 20” hole to 46. 6’ ; at 7:30 A. M. ran 40’ -16" -3/16” w a ll, e le c tr ic weld, Western Pipe and S teel Co. casing, co lla rs each end, hang at 39’ and cemented ' w ith 39 sacks cement; 16” landed 39’ below c e lla r flo o r or 46. 6’ below ta b le; made up c e lla r connections; found cement at 41’ 5" from bottom. 10:00 A. M. d r ille d out cement; d r ille d 15-1/8” hole from 46 to 206’ D rille d 15-1/8” hole to 468’ D rille d 15-1/8” hole to 512’ ; sta rtin g running casing at 10:00 A. M .; ran 511*9’ -10-3/4" casing, landing and cementing same 506. 4’ and cemented with 290 sacks V ic to r Modified o i l w ell cement; cementing completed 3: 30 P. M. 511*9’ casing was 10-3/4" -40*5# Lapweld, Grade H-40, Range 1, T & C, Baker W hirler Float shoe on bottom. Squeezed 150 sacks V ic to r Modified O il W ell cement between the 16" and 10-3/4” Standing cemented 8:00 A. M. landed casing, made up c e lla r connections, made pressure te s t on casing, proved okeh; d r ille d out casing shoe; found cement at 503’ ; d r ille d 9- 3/4" hole from 503 to 576’ D rille d 9-3/4" from 576 to 306’ Ran 315’ -7" lin e r including 300’ perforated on bottom and landed same at 806’ ; top o f Baash-Ross s teel adapter on top o f lin e r at 491’ > washed, w ell from bottom; displaced mud; w ell started to flow at 11:00 P. M.