Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
\ UNION PACIFIC RAILROAD COMPANY Las Vegas, Nevada Water Well No. 2 HISTORY 8-24-36 From Aug, 5, 1936 to Aug, 24, 1936, preparations fo r d r illin g . Started d r illin g -d r ille d 41 f t in s i l t , limerock and packed s ilic a sand 8—25—36 44 f t d r ille d in S ilic a aand-repaired bo iler-u sin g so lid tools-have to keep pipe below t o o l-lt is very lo o s e -le ft hole in evening with pipe 1 0 * ahead of tools, s t i l l looking fo r something hard 8-26-36 Sand s t i l l heaves up in o asln g-d rilled 40 f t in loose s ilic a sand 8-27-36 To repair sand lin e -d u tc h and d r i l l . D rille d 18 f t in loose s ilic a sand 8—28—36 8-29-36 8—30—36 Waiting fo r pipe Unload pipe and tools and d r i l l 30 f t in loose s ilic a sand W ill land 16* when I get same, 50* in clay i f I do not get hard below, d r ille d 53 f t in S ilic a sand (loose) and red clay 8-31-36 Set 16* on lim eston e-drill thr same 3 f t . Put in test pump before perforating p it to see i f I could handle water, p u ll same and cut, after cutting i t took two hours to drain p it. D rille d 1© f t red clay, limestone and clay 9-1-36 Pump out of p it - wait on gravel. Did not want to start late want to pour a l l cement in one day 9-2-36 Pump out of p it, started to pour cement-mixer motor broke down repair same, pump sand up, w ill halt to b a i l-sandstorm today 9-3-36 9-7-36 Finished pouring cement cut 16* off-put up safety lin e W ill have to repair scow in A.M, W ill not hold clay cuttings, Hole very muddy. This is the second pump sent me on th is job that needs repairs badly. D rille d 60 f t with limestone streaks 9-8-36 We had 2 scow valves to repair well flows a l i t t l e , 9-9-36 pressure very lig h t . Ran 50 f t , in clay and gravel. Well started to flow between 16* and 12* makings about 100 gals, per minute limestone 423-427 flowed over 12 inches, d rille d 60 f t in clay, gravel and limestone. Well 433 feet 9-10-56 S t i l l flows between 16* and 12* - d rille d 48 f t in eand, clay limestone and broken rock (lime rock) 9-11-36 No change in flow between 16" and 12*, Ran 75 f t in 9-12-36 limestone and red elay Flow stopped between 16* and 12*. D rille d 64 f t in red clay and cement gravel