Information
Digital ID
upr000218-311
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.7 A Mr* V. W. Smith: Operating Expenses: Excavate and backfill new trenoh Lin•Pt* 2,225 Haul and lay pipe » 2,225 Dig up existing lines M 2,225 Backfill old trench tt 2,225 Remove pipe replaced H 2,225 Contract Cost, $25,514.00 Two sets of following AG Drawings are furnished you herewith: Drawing F-363-1 FK-43367475-521 K5724571 SK-101§45 2B-»J-g9b 16179-1 16179-2 16179-3 l6l79-i 16179-5 16179-6 11631,7 9-i7n clt*o 16179-1*4 16179-15 A 16 16179-17 & 15 Description_______________________ PPlraonf iolfe 24" G.X. Pipe Line h # *t « Outline of Fire Pump Panel Wiring Diagram Fire Pump Controller Plan and Elev. of Fire Pump Plan and Elev. of Booster Pumps Manhole for 24" Valves in Charleston Blvd* Plan of Piping Layout in vicinity of Booster Pump House Piping and fence layout at Reservoir General Plan of Water Facilities adjacent to Charleston Blvd. Profile of Pipe Lines from Reservoir to Welle 9* 10 and 11 Map showing Power Line Plana of Reservoir Plan of Settling Basin Plan of Fire Pump House Plan of Booster Pump House. lrmsc R. L. Adamson I