Information
Digital ID
upr000218-078
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.fffalill LOS LAKg RAI^OAD COKFAgY Division - California 1950 Budget Item Mo. 1 Location: Las Vegas* Nevada Description of Inatall 1520 lin. ft. of 12* Transit# Work: pipe water line from Well #8 to settling basin serving Charleston Blvd. reservoir. Necessity for Wells Hos. ttork: to Charl es9,t on10 reasnedr v1o1i rn odwo cnoontn efcutrendish sufficient water to meet demand during peak periods of use in summer months* and provide adequate surplus for an eaergenoy such as a fire in southerly portion of City or along Charleston Blvd. Installation of this line will permit temporary diversion of flow from Well So. 8 to Charleston reservoir. Estimate of cost: $3 260 i Recommended by: Vloe president-tVL&WOo.