Skip to main content

Search the Special Collections and Archives Portal

upr000216 135

Image

File
Download upr000216-135.tif (image/tiff; 26.25 MB)

Information

Digital ID

upr000216-135
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    E S T A B L IS H E D IB B B C E N T U R Y Z - B C 3 B V 5 BED AVALDN BOULEVARD Lds A n g e l e s 3 tCa l . September 21, 1945 Union Pacific Eailroad Co. 422 West Sixth Street Los Angeles 14, California Attention of Mr. Frank Strong Gentlemen: PROPOSED RESERVOIR, ETC., AT LAS VEGAS. NEVADA We propose to furnish all supervision, labor, material and equipment to do the following work at Las Vegas, Nevada, for the guaranteed maximum sum of $159,018.00, which includes our fee of $14,456.00: Construct concrete reservoir, of one and one-half million gallons capacity, in accordance with drawings now being prepared by George E. Brandow; Construct concrete settling basin in accordance with drawing now being prepared by George E. Brandow; Construct pump house, fire pump house and two concrete valve boxes, and excavate and backfill trenches for by-pass lines and fire pipe lines in accordance with drawing prepared by your office, revised August 11, 1945, Excavate and backfill trenches for pipe lines connecting the reser­voir with the pump house and settling basin, and connecting the settling basin with wells 8, 9, 10 and 11 in accordance with profile prepared by your office dated July 16, 1945; * Excavate and backfill trench for a 24-inch diameter pipe line, in a location and at elevations to be designated by you, connecting the pump house with your existing pipe line near the intersection of Charleston Boulevard and Main Street, except the portion of this trench which is beneath the road bed of your tracks. In making this proposal we have estimated that excavation and trenching can be done at an average cost of $3.00 per cubic yard. Preliminary investigation shows no ground water, except possibly at the pump house site. Our experience in the general Las Vegas territory, however, indi­cates that ground water level is quite variable, and if water is encountered in such quantity as to necessitate pumping, shoring, and other unforeseen expense, we will expect to be reimbursed for such additional expense at cost.