Skip to main content

Search the Special Collections and Archives Portal

upr000215 109

Image

File
Download upr000215-109.tif (image/tiff; 23.81 MB)

Information

Digital ID

upr000215-109
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    July 19*. 1946 7334 MeKell Construction Co., 5860 Avalon Boulevard, Los Angeles 3, C aliforn ia Gentlemen: In connection with contract fo r construction of reservoir and water f a c i li t i e s at Las Vegas, Hevada, please be advised that I t has now been decided to eliminate the following work which was included in the contracts (1) Dismantle and remove pipe lin e between Wells Hos* 8 and 10, consisting o f 150* - 10* C .I .P ., 812*-12" C .I.P . and 1196*-14” Trans­it s pipe, to ta l 2,158 f t * (2) Lay 12* C .I. pipe lin e and b a c k fill trench from W ell Ho* 9l to junction with lin e between W ell Ho. 9 and se ttlin g basin , using salvaged 12* C .I* pipe including removal of existing connections to Well Ho. 9, turning cross on w ell and in sta llin g connections to new lin e - 357*-12* C .I. pipe lin e . (3) Clean and recondition a l l pipe removed under Item 1 and deliver a l l pipe not used under Item 2 to-Railroad Company Store yard at Las Vegas. (4) B a c k fill trench from which pipe Is to be re­lieved between Wells Hos. 8 and 1C* As this was a part of the work to be performed under your guaranteed cost proposal, please advise the amount of credit to be allowed due to elimination of above work. Yours very tru ly , FRANK St'&JiVG V