Skip to main content

Search the Special Collections and Archives Portal

upr000215 95

Image

File
Download upr000215-095.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000215-095
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

duration o f each pressure te s t s h a ll be at le a s t 30 minutes. A l l exposed pip es, f i t t i n g s , v a lv e s , hydrants and jo in ts w i l l be c a r e fu lly examined during the open trench t e s t . Where the jo in ts are made w ith sulphur compound and show seepage or s lig h t leakage, only such jo in ts as may be d e fe c tiv e sh a ll be cut out and replaced as d ire c te d by the Engineer. Any crack­ed or d e fe c tiv e pipes, f i t t i n g s , v a lv e s or hydrants d isco ver­ed in consequence o f th is pressure t e s t s h a ll be removed and replaced by the Contractor with sound m a teria l and the te s t s h a ll be repeated u n til s a tis fa c to r y to the Engineer. B a c k fill S elected b a c k fill m a teria l fr e e from rock or boulders s h a ll be deposited in the trench simultaneously on both sides o f the pipe fo r th e f u l l w idth o f the trench and to an e le v a ­tio n o f not le s s than 6 inches above the h o rizo n ta l center lin e o f pipes w ith diameters 12 inches or la r g e r , le a v in g the jo in ts exposed f o r examination during the pressure t e s t . The b a c k fill m a teria l s h a ll be thoroughly compacted under and on each side o f the pipe to provide s o lid backing against the extern al surface o f the p ip e. Succeding la y ers o f b a c k fill may contain coarser m ateri­a ls , and s h a ll be fr e e from brush or any other perishable or ob jectio n a b le matter th at would prevent proper con solid ation or that might cause subsequent settlem en t, and s h a ll be com­pacted thoroughly by puddling w ith hose and long n o zzle , or by flo o d in g the trench, or by tamping i f the m aterial does not puddle r e a d ily . A fte r h y d ro sta tic t e s t has been made as s p e c ifie d and pipe is f u l l o f w ater, the pipe s h a ll be tapped at in te r v a ls as d irected by the Engineer fo r the purpose o f providin g water fo r trench flo o d in g . Contractor s h a ll fu rn ish la b o r, m ateria l and to o ls f o r th is work. I t is important th at proper precautions be taken to prevent flo a t in g o f the pipe when flo o d in g th e.tren ch , and the Con­tra c to r s h a ll be w holly resp on sible fo r n eg lect o f these precau tion s. No rock or boulders s h a ll be used in the b a c k fill fo r at le a s t one fo o t above the to p o f the pipe. R estora tion o f Surface The Contractor s h a ll re s to re a l l paving, curbing, s id e ­walks and g u tters, in accordance w ith s p e c ific a tio n s and to the s a tis fa c tio n o f State o f Nevada Highway Department and the C ity o f Las Vegas, and s h a ll rep lace a l l shrubbery, fen ces, sod, and other surfaces disturbed, to a con dition equal to that b efo re the work began, fu rn ish in g a l l labor and m a teria l In cid en ta l th ere to . In r e s to rin g paved surfaces new pavement is req u ired . No permanent paving sh a ll be p la c ­ed w ith in 30 days a ft e r the b a c k fillin g s h a ll have been -4 -