Information
Digital ID
upr000214-244
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Los Angeles, April 13, 1942 7334 Mr* 0. M. Stayner - Salt Lake Attached find two prints of Dwg. No. 16054-1 dated March 20, 1942, showing details of construction of proposed pump house 21* x 42* to house the booster pumps at the reservoir, Las Vegas, Nevada. Mr. Kahler is of the opinion you have already ordered all electrical material and equipment required for the operation of the pumps and for lighting the pump house. However, he sug-guested that I send you additional prints so you will have ooples of same for checking over electrical material required and placing rush order for any items that may not now be ordered. I suggest you do this as quickly as possible so there will be no delay in the furnishing of material. rla-k W .H .J. -APR 1 3 1942 R. L. Adamson