Skip to main content

Search the Special Collections and Archives Portal

upr000213 197

Image

File
Download upr000213-197.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000213-197
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    ELECTRIC POWER -PRODUCERS 2 Class 1—The dollar value of Items of ma­terial of this class in Inventory on the most recent date In 1940 on which the producer’s Inventory was taken, Increased proportion­ately to the Increase In system output in the twelve-month period preceding the current quarter over output in 1940. Class 2—The dollar value of items of ma­terial of this class in Inventory on the most recent date in 1940 on which the producer’s inventory was taken. Classes 3 and 4—Four-thirds ot the dollar value of withdrawals in this class made dur­ing the last nine months of 1942 feu: use as 2 See Schedule A for complete identification of classes. “maintenance, repair, -and operating sup­plies” , as those terms were defined in Utilities Order U -l as amended Septembei 24, 1943.' Class 5—Fifty meters at each operating headquarters plus one and three-quarters percent of the meters installed in plant on the first day of the preceding calendar quarter. Class 6—Four-thirds of the dollar value of withdrawals in this class made during the last nine months of 1942 for use as “main­tenance, repair, and operating supplies”, as those terms were defined In Utilities Order U -l as amended September 24, 19432 Class 7—Two-thirds of the dollar value of withdrawals in this class made during the last nine months of 1942 for use as “main­tenance, repair, and operating supplies” , as those terms were defined in Utilities Order U -l as amended September 24, 1943.' CENTRAL STEAM HEATING PRODUCERS 2 Class 1—The dollar value of items of terial of this class in inventory on the most recent date in 1940 on which the producer’s inventory was taken, increased proportion­ately to the increase in system output in the twelve-month period preceding the current quarter over output in 1940. Class 2—Four-thirds of the dollar value of withdrawals in this class made during the last nine months of 1942 for use as "main­tenance, repair. and operating supplies” , as those terms were defined in Utilities Order U -l as amended September 24, 1943.1 Class 3.—Two-thirds of the dollar value of withdrawals in this class made during the last nine months of 1942 for use as “mainte­nance, repair and operating supplies” , as those terms were defined in Utilities Order U -l as amended September 24, 1943.1 [Schedule D deleted Aug. 31, 1944.] GPO—-War Board 13400— p. 4