Information
Digital ID
upr000212-131
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Los Angeles, October 30, 1939 GFA • Om a h a • A - 1 9 6 • W i t h e x c e p t i o n Items 4 and 5 the e s t i m a t e d costs are sufficient. As i t e m 4 Is a L V L & W expense n e c e s s a r y add $ 5 0 0 f o r commercial frei g h t o n pipe. R e c e n t l y L V L & W acquired 8 0 acre& a d j o ining springs at $20 p e r acre, However, W R B advises his efforts to secure additional land at this price u n s u c c e s s f u l a n d suggests average price $ 3 0 p e r acre. It is p r o p o s e d to use 1 0 w pipe line f o r h a n d l i n g w a t e r f r o m Stew a r t & M a i n Sts. to the Clarke R a n c h as recomm e n d e d in I t e m 4. O n above basis D i v i s i o n Expense follows: R a i l r o a d Company * Total Inv. O E I t e m 1 1 Clean spring Construct retaining w a l l and 250 25Q cover 1 8 0 0 1 1800 T i p e lines and p u m p i n g equipment 1 2 0 0 - 1200 Contingencies 250 i f oo 250 I t e m 2 - Construct 2 n e w wells inclu d i n g pipe lines 14 0 C 0 1 14000 Contingencies 1000 vvfca 1000 1/ 50s 0 I t e m 3 - R e c o n dition W e l l No. 2 1500 I t e m 5 - Purchase 200 acres land i $30 6000 6000 T o t a l R a i l r o a d Expense 26000 24250 1750 L a n d Company • I t e m 4 - Construct 4000* of 1 0 w cement pipe line 3700 3700 Contingencies | 300 300 To t a l L a n d Co. Expense 4000 4000