Skip to main content

Search the Special Collections and Archives Portal

upr000212 79

Image

File
Download upr000212-079.tif (image/tiff; 23.65 MB)

Information

Digital ID

upr000212-079
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    % O O P Y T E L E G R A M MIDDLE SPRING, INCLUDING THE RENEWAL OF OLD CONCRETE CONSTRUC­TION, IS LARGELY A REPLACEMENT OR OPERATING EXPENSE PROJECT AND SHOULD BE SO TREATED ALSO THAT THE RECONDITIONING OF WELL NO. 2 IS PURELY AN OPERATING EXPENSE PROJECT. IF THIS IS CORRECT, THEN" THE A D D I T I O N A L A P P R O PRIATION REQUIRED WOULD B E LIMITED TO EXCESS EXPENDITURES FOR DRIL L I N G THE 2 NEW WELLS A N D FOR THE CHANGE IN PROPOSED L O C A T I O N OF P I P E L I N E TO THE RANCH, TOGETHER WITH THE S U B S T ITUTION OF CAST IRON FOR CEMENT AS ORIGIN A L L Y PROPB3ED. WILL Y O U PLEASE ADVISE, ALSO FURNISH MAPS IN DUPLICATE SHOWING THE ORIGINALLY PROPOSED AND NEW L O i * C A T I O N OF PIPEp ? LINE. ' . ; A 114- WMJ ¥