Information
Digital ID
upr000212-028
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree._<N l§ E s t i m a t e d Coat o f Drilling 2 Walls and c o n s t r u c t i n g appurtenances, based o n b i d f r o m Roacoe Moss Company Labor Material R. & E. 0* E. Drill 2 wells, approx. 500» deep, including furnishing and Installing all easing, etc* Contract Roscoe Moss Co* # | 9,700 $ Cement * furnished by RRCo* 300 $10,000 Construct pipe line connections from wells to collecting lines 500 1,050 1,550 install pumps and motors and construct pump houses, 450 4,650 6,100 Construct concrete mat around well and fence, 150 250 400 Construct power line, including transformers, ete* 1,215 4,280 5,495 Install telemeter end construct circuit, 100 500 600 Replace 954* of 24* redwood stave pipe with welded steel pipe, 2,550 2,700 2,700 2,350 Current price adJusfcment-valve- of parts replaced, 8,700 2,700 Contingencies, 476 2,350 2,306 500 Totals, $5,240 $25,760 $25,450 $5,550 Total Estimated Expenditure, M z 000