Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.COST ESTIMATE V - Union Pacific Railroad Company 2 Water Well® - Las Vegas, Nevada 1» SO.©;* Water Well - Las Vegas 10-3/4* Water String - 7" Liner MUD; 30 Tons Rotary Mud, FOB car 20 Sacks Aquagel SETS; 1 -1/2 Used Wright 20" Pilot 1 -1/2 Used Hughes 1 15-1/8" Tricone -Hughes Tricon© 9-3/4-* CASING; 40* -16*, 3/16" Plate Electric Weld at 1.86 6* -21-1/2", 3/16" Plate Electric Weld at 1.86 550* -10-3/4", 40.5#, E-G or Lapweld at 1.53 327* -7", 20# E-G or Lapweld at 1.20 CASING PERFORATING; 307* -7", 20# Casing, 60 Mesh, 14 Rows, 6* Centers, 2" Slots e.t 804 per foot CEMENT AND CMENTSRS: 1 - Cement Job 400 - Sacks Cement at 60$ FOUNDATION; CHRISTMAS TREE FITTINGS; 1 - 10-3/4* Close Nipple 1 - 10-3/4* Flange 1 - 10-3/4* Flanged Cross 1 - 10-3/4" Bull Plug, Drilled for Gauge 2 - 100# Merco Plug Cocks Flahged MISCELLANEOUS; 1 -10-3/4* Float Shoe ) 1 -7* to 10-3/4" Adapter ) 1 -Set 10-3/4* Casing Clamps ) CONTRACTOR*S CREW AND RIG TIME: CONTRACTOR’S MOVING, RIGGING-UP AND UNRIGGING (1/2 Total Cost)_______ | 330.00 40.00 i 370.00 76.44 128.00 114.00 313.44 74.40 15.94 841.50 392.40 1324.24 245.60 225.00 240.00 465.00 225.00 3.00 5.43 105.07 14.10 201.63 329.28 250.00 3500.00 2000.00 19027.56 10$ Contingency 902.75 $9930.31