Skip to main content

Search the Special Collections and Archives Portal

upr000210 271

Image

File
Download upr000210-271.tif (image/tiff; 27.49 MB)

Information

Digital ID

upr000210-271
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    COST ESTIMATE Union P a cific Railroad Company 2 Water Wells - Las Vegas, Nevada . 800’ Water Well - Las Vegas 10-3/4** Water String - 7” Liner MUD; 30 Tons Rotary Mud, FOB car 20 Sacks Aquagel $ 330.00 40.00 BITS: 1 -1 /2 Used Wright 20* P ilo t 1 -1 /2 Used Hughes 15-1/8" Tricone 1 -Hughes Tricone 9-3/4" ' ?! ? „ -y Y ? CASING: 40* -16", 3/16" Plate E lectric Weld at 1.86 6’ -2 1 -1 /2 ", 3/16" Plate E lectric Weld at 1.86 ® 55O* -1 0 -3/ 4" , 40.5#, H-G .or Lap weld at 1.53 / ; 327* -7 ", 20# H-G or Lapweld at 1.20 76.44 128.00 114.00 74.40 15.94 8 a * 50 392.40 CASING PERFORATING: ; ? 307’ -7 ", 20# Casing, 2" Slots at 80$ & 'VO 60 Mesh, 14 Rows, per foot CEMENT AND CEMENTERS: 1 - Cement Job 400 - Sacks Cement at 60$ 225.0 0 *-" 240.00 FOUNDATION: CHRISTMAS TREE FITTINGS: 1 - IO-3/ 4" Close Nipple 1 - 10-3/4" Flange ^ ( 1 - 10-3/4* Flanged Cross \ 1 - 10-3/4" Bull Plug, D rilled fo r Gauge 2 - 100# ffierco Plug Cocks Flanged J S W k . MISCELLANEOUS: 1 -10-3/4" Float Shoe . ) / 1 -7 " to 10-3/4" Adapter 9 f0 ) y 1 -Set IO-3/ 4" Casing Clamps ) 3.00 5 .43 105.07 14.10 201.68 I CONTRACTOR’ S CREW AND RIG TIM—E—: \ CONTRACTOR’ S MOVING, RIGGING-UP AND j UNRIGGING (1 /2 Total Cost)__________ 10$ Contingency 1370.00 313. a 1324.24 245.60 465.00 225.00 329.28 250.00 3500.00 - 2000. 0 0 , 19027.56 902.75