Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
COST ESTIMATE Union P a cific Railroad Company 2 Water Wells - Las Vegas, Nevada . 800’ Water Well - Las Vegas 10-3/4** Water String - 7” Liner MUD; 30 Tons Rotary Mud, FOB car 20 Sacks Aquagel $ 330.00 40.00 BITS: 1 -1 /2 Used Wright 20* P ilo t 1 -1 /2 Used Hughes 15-1/8" Tricone 1 -Hughes Tricone 9-3/4" ' ?! ? „ -y Y ? CASING: 40* -16", 3/16" Plate E lectric Weld at 1.86 6’ -2 1 -1 /2 ", 3/16" Plate E lectric Weld at 1.86 ® 55O* -1 0 -3/ 4" , 40.5#, H-G .or Lap weld at 1.53 / ; 327* -7 ", 20# H-G or Lapweld at 1.20 76.44 128.00 114.00 74.40 15.94 8 a * 50 392.40 CASING PERFORATING: ; ? 307’ -7 ", 20# Casing, 2" Slots at 80$ & 'VO 60 Mesh, 14 Rows, per foot CEMENT AND CEMENTERS: 1 - Cement Job 400 - Sacks Cement at 60$ 225.0 0 *-" 240.00 FOUNDATION: CHRISTMAS TREE FITTINGS: 1 - IO-3/ 4" Close Nipple 1 - 10-3/4" Flange ^ ( 1 - 10-3/4* Flanged Cross \ 1 - 10-3/4" Bull Plug, D rilled fo r Gauge 2 - 100# ffierco Plug Cocks Flanged J S W k . MISCELLANEOUS: 1 -10-3/4" Float Shoe . ) / 1 -7 " to 10-3/4" Adapter 9 f0 ) y 1 -Set IO-3/ 4" Casing Clamps ) 3.00 5 .43 105.07 14.10 201.68 I CONTRACTOR’ S CREW AND RIG TIM—E—: \ CONTRACTOR’ S MOVING, RIGGING-UP AND j UNRIGGING (1 /2 Total Cost)__________ 10$ Contingency 1370.00 313. a 1324.24 245.60 465.00 225.00 329.28 250.00 3500.00 - 2000. 0 0 , 19027.56 902.75