Skip to main content

Search the Special Collections and Archives Portal

upr000210 158

Image

File
Download upr000210-158.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000210-158
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Bryan .*?t Jackson Co. 2-19-42 Los Angeles, Calif. Store 437, 36-SD 7 3 7 , Las Vegas, Nevada Union Pacific R.R. 2 - 50 HP Submersible Deepwell turbine pumps with capacity SOO GPM against a total operating head of ISO ft Consisting of: (NOTE - 1 of the above pumps for use in 1 3 -3 /°" OD well casing and the other for use in 10" ID well casing) 2 - No. 2K, 4 stage latest improved Byron Jackson Deepwell Turbine pump bowl assemblies, fitted with hand selected semi-enclosed bronze Impellers, enameled pump bowls and stainless steel pump shafts. IgO Ft. Standard discharge column pipe for use in 1 3 -3 /g" OD well easing ISO Ft. Standard discharge column pipe for use in 10" ID Well casing. 400 Ft. Approx. No. 3 Electric armor clad conductor cable 2 - Complete sets Column cable clamps 2 - 50 HP, 440 volt, 60 cycle, 3 phase, 4 pole 1750 RPM vertical Byron Jackson Submersible motor complete. If an Erecting Engineer-i%^^ee9X5a.'"uo^supervise the installation and starting of these units, Per day» lndluding expenses, but not transportation.-kiUjjrp&i’ij|kCif4$gRailroad will furnis; transportation for the Erecting Super^^&_-&¥Kf^b&r dfclther f ronr. your \ 2 - Steel strainers and motor connectors 2 - Steel surface plates complete with flanged 90 deg. discharge elbows to fit discharge column pipe. 2- Steel encased 50 HP, 440 volt, Square D outdoor type pumping plant electric panels complete with outdoor weather accessories. 1 2 ,3 7 5 .0 0 each F.O.B. LOS ANGELES LaWsa teVerg awsells reqn 64-52 appd WHJ WO Pending Salt Lake or Los Angeles Office.