Information
Digital ID
upr000208-207
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Copy for Mr. Knickerbocker / Water Supply at X*as 7egas: Las 7a gas - July Tth, 1936. f 23-3-5 Hr. R. 1. Adamson Chief &ngine#r, liOS Angeles, Cal. Ids M Dear ^ ir : Confirming ottr phone conversation this a ft e r noon, regarding the use o f Cash man's ditcher fo r straightening out the La a Vegas Creek: making a new ditch between the Middle Spring and present bridge a t la in Street! and is , of course, merely an estimate, Our figures are based on the Barbara Oreen ditcher excavating at an average depth o f 3 fee t, width 20 inches, and trenching approximately 1700 lin e a l feet per day. Above does not Include expense of engineers setting grade stakes or supervision expense. I show below a detailed estimate of cost of 6 days machine rental @ #20.00 per day $120.00 6 days labor @ 12,00 per day 72,00 6 days fu e l, o il & tools 10.00 per day 60.00 7 days hand labor, turning creek into new ditch and closing o ff old ditch, ® #20.00 per day 140,00 Estimated total $ 392.00 This estimate was compiled here in the o ffic e , Tour s tru ly . m i t m a. BitAcmr. r M o 1936 \ Os