Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.February 1, 1928. 9315-355 Mr* 1* £« Calvin, Vice-President* Omaha, Nebraska. Dear S ir: Attached proposed work order authority contemplates a Capital Expenditure of $990 for in stallation of second h alf of f i l t e r in water softener at Las Vegas, Nevada. Water now supplied to b o ile rs in power house is not satisfactory as the h alf f i l t e r now in water softener allows too large a percentage of encrusting solids to remain in the water* A complete f i l t e r w ill overcome this d iffic u lty and resu lt in more economical operation of the power plant. f j . S lo u ts vary tru ly , y l x 1928 (Signed) F, E. KJU CKEliB 0 CKEtf 3a