Skip to main content

Search the Special Collections and Archives Portal

upr000208 51

Image

File
Download upr000208-051.tif (image/tiff; 25.83 MB)

Information

Digital ID

upr000208-051
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

% (J L Los Angelas, February 29, 1928. 9215-355 Mr. R. L. Adamsons In reply to your le tte r of the 27th instant f i l e 20-6 I quote below extract from memorandum prepared in the President's o ffic e pertaining to 1928 Budget Item 68. Determination “This should be programmed and the reservoir only built in 1928. The item has been reduced from #178,000 to #71,000 to cover the re se rv o ir." My le tte r of the 21st instant was based upon above information, but i f there is any question as to items to be included in the Form 30 submission fo r an appropriation of #71,000 I would suggest that you take it up with Mr. Mann as he no doubt furnished segregated cost estimate fo r con­sideration of President Gray. It would probably be impracticable to provide a new reservoir without gravel f i l t e r at intake also a proper outlet to the existing water main. ^ ri TT, ^AH 1 i fefc 8 ' F. H. Knickerbocker