Skip to main content

Search the Special Collections and Archives Portal

upr000205 114

Image

File
Download upr000205-114.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000205-114
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    C O P Y % Water Facilities - Material Ordered in Connection with 4-2 Pocatello - November 20, 1946 Mr, J, L, Irish - Omaha (CC - Mr • F, E. Cragin-Los Angeles Mr* H, W. Crawford-Las Vegas) Referring to your letter of November 12, file 4-2, addressed to Messrs, Cragin and Crawford, pertaining to Shipping Notices, Nos* 2 to 5 , inclusive, covering surplus material returned to the Store in connection with W0-3lg0. When at Las Vegas recently, and before seeing the copy of your letter, I was making a check of material sent back to Store after completion of Veil No, 11 and I was of the opinion that it did not appear necessary to retain the entire quantity of various items for emergency stock, in connection with the notation shown on shipping notice No* 2 reading, "Hold for Emergency Stock per request of FS", In the case of thfe Transite pipe, our check at Las Vegas shows that we actually received the following from the particular Well just referred to, which you will see does not tally with the quantity listed on the shipping notice. To show just what was received after the completion of that particular Well job I am showing separately quantities where the pipe is not in the standard 1 3 ft, lengths. 6 ft. lM-3 ft, £ ft. 52 ft. 26 ft. 5 2 ft. ft. 6 ft. 6 ft. 1 1 ft. loll-, ft. 6" 9" 1 2 8 Dia,* Glass 50 3 /4.8 Wall ^ 1 2 " Dia.* H 3 A « Wall r 2 0 " Dia. A n 1 " Wall y ! 20 " Dia. x H 1 -l/g" Wall 24" Dia. 7 11 1-3 A " Wall ! 24" Dia. A 8 3/4-" Wall — 24" Dia.* a 1-1/4-" Wall 24" Dia.A 8 1-1/4-" Wall 24" Dia.* 8 1-1/4-" Wall h'-t 24" Dia.x H 1-1/4-" Wall 24-" Dia.* 8 N 1-1/4-" Wall Also, in addition to the above quantities which were returned after completion of Well No, 11, we still have the following Transits pipe which was turned back to us from other Well jobs and which we were previously re­quested to hold for emergency repair work: 26 ft. g" Dia. 52 ft. 16" Dia. * 52 ft. 20" Dia. * 52 ft. 24" Dia.y Glass 50 1/2" Wall " 1/2" Wall " 1- l/g* Wall " 3/4" Wall