Skip to main content

Search the Special Collections and Archives Portal

upr000204 113

Image

File
Download upr000204-113.tif (image/tiff; 23.52 MB)

Information

Digital ID

upr000204-113
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Los Angeles, March 16, 1953* MEMO 1-733*1 E.C.R. Regarding the drilling of additional water well in shop grounds, Las Vegas, and transferring of water appropriation of 2.5 c.f.s. owned by the LA&SL from Well No. 1 in the water field to the existing shop well and proposed new shop well: Upon investigation I learned that our Division forces submitted recommendation for 1953 Improvement Budget to drill a 16” water well in the shop grounds with booster pump, 300,000 gallon elevated water tank with necessary pipe lines estimated to cost $116 ,600, of which amount $112,1|.60 is chargeable to Investment and $lj.llj.O to Operating Expenses. This was included in 1953 approved Budget as Item No. 15. However, the Division*s estimate was increased by $5400 and the Budget authority covers $117* 5*4-0 to Investment fl|460 to Operating Expenses and total $122,000. Accordingly the Division submitted Form 30 on January llj., 1953* request­ing authority to proceed with the installation of these improvements but to date approved work order has not been issued to cover. I am attaching draft of proposed letter to Mr. Stoddard for Mr. Reinhardt*s signature as you suggested. Will you please look it over, making any changes you con­sider necessary and return it to me.