Information
Digital ID
upr000204-075
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.F O R M 2191-B 10-47-750M UNION PACIFIC RAILROAD COMPANY Time^IRfed___ : TELEGRAM C O P Y Salt Lake City, June 5, 1953. PJL WCP - Omaha WE-LA Orig. PJL Oma Cy WCP Oma WE LA. A-132. Division Engineer personally in touch with this project^ and is expediting all possible. Change-over of water lines to stockyards has been completed. We are now working on change-over line to garbage disposal dock. 1500 feet eight inch pipe out of Omaha yesterday, which will be installed immediately upon receipt. ' All material has been I , ordered. It is our understanding that we will not .undertake drilling of well until further advised. ? ' „ In connection with tank. Superintendent wired Mr. Perkins direct May 29th suggesting identical tank be purchased as was furnished by Chicago Bridge & Iron Company WO 5015, at Las Vegas, and requesting that if he / approved, to arrange for requisition and contract'. We will continue maintenance work at wells until otherwise instructed. I concur in recommendation that purchase arid erection of tank be contracted, the same as was done in connection with WO 5015. D-322 A.D.H. Orig. on vol 5- Pile 1-7334 Las Vegas Valley Water Dist.