Information
Digital ID
upr000202-021
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Los Angeles, August 17, 1951 733** Mr. P. G. Martin - Los Angeles Attached please find two prints o f the following Drawings covering fa c ilitie s to he constructed under Work Order h?28 In oonnec-tlon with Well #11 at Las Yegas, Nevada s Drawing 1623*+-1 - Proposed pump house and facilities for Well #11, Drawing 1623**—2 - Proposed horisontalMpump and piping to he installed at well #11. As you knew, this well is now being operated by temporary rental pump which should remain in operation without Change until possibly the early part of Oetoher at which time it is estimated that the rental pimp can be removed and permanent pump Installed together with building for same* I f pump is shipped at scheduled it w ill probably be received the latter part of this month. I®1 Ml \ r j j II H 0 M v j : R. L. ADAMSON -V" Hmi 1 i ® . v <2* m S § | | g| = > m m i s §ji