Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
More Info
Rights
Digital Provenance
Publisher
Transcription
The Railroad is willing to construct^ User’s connection and furnish the User sufficient water for User's requirements from such surplus water as it may have available 2 3 4 56 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 from such source beyond the needs and requirements of railroad uses at its Las Vegas terminal, and such other uses as the Railroad has heretofore agreed to supply, on the following terms and conditions: IT IS THEREFORE AGREED: I. The Railroad shall at the sole cost and expense of the User, install, maintain and remove User's connection consisting of___________ inch meter and pipe of__________inch diameter a.nd___________ feet in length, required for service to f ^ |l the User under this contract, and^sell and supply to the User through said ’’User’s Connection” such surplus water as the Railroad may have available at Las Vegas beyond its said needs and requirements, at the price and rate of 12-|jzf for each 100 cubic feet of water up to 800 cubic feet; and 10^ per 100 cubic feet for all water furnished in excess of 800 cubic feet, with a minimum charge of #2.50 per month. II. The User shall pay to the Railroad, before any work on installation is begun, the cost of '^User's Connection" hereby fixed at #___________, and upon presentation of bills therefor shall pay to the Railroad all expense incurred by it in the maintenance and removal of said "User's Connection", and shall, on or before the 10th day of each month immediately following the month in which such water is furnished, pay the Railroad for all water so taken, if in excess of the minimum charge, and if less than the minimum charge, the sum of #2.50. ~2~