Skip to main content

Search the Special Collections and Archives Portal

upr000195 238

Image

File
Download upr000195-238.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000195-238
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Las Vegas - March 2, 1954 W 23-1-66 Mr. C. M. Cory - Las Vegas cci Mr. Win. Reinhardt Mr. E. E. Bennett Will you please prepare the usual form of Refund Agreement with Desert Park, Inc., & Nevada corporation whose place of business is 600 Fremont Street, Las Vegas, Nevada, covering construction of cast iron water mains and fire hydrant connections to serve Blocks 1, 3» 4 and 5, inclusive, of Desert Park Subdivision Mo. 3, Las Vegas, Nevada. Location of said water mains and fire hydrant connections will be as indicated on Drawing Ar-1102 dated February 24, 1954, ten copies of which are attached hereto. SUBDIVIDER AGREES? 1. At its own expense to furnish all necessary labor and materials and to construct; (a) Approximately 1895 LF of 6* cast iron water mains. (b) Approximately 20 LF of 6H oast iron fire hydrant connections The cost of constructing said water mains (exclusive of cost of constructing said fire hydrant connections) is agreed to be the sum of #6,446.00. 2. Said water mains shall be constructed of 6" Glass 150 B & 3 cast iron pipe and shall be in accordance with Federal specifications WMF 421 Type 1. All joints shall be cement. All fittings shall be new, all bell cast iron equal to ASA Standard Glass 250. All valves shall be double disk, parallel seat bronze mountings conforming to AWWA standards, not less than 175 lbs., and all valve boxes shall be of cast iron of appropriate size for each valve. Unless otherwise approved by a duly authorized representative of the Company, all pipe valves and fittings shall be manufactured by the Pacific States Cast Iron Pipe Company or Mueller Company. All pipe lines shall be chlorinated in accordance with A W A specifications, shall be subject to the approval and acceptance of State and City Health Authorities, and shall be constructed at an elevation to be designated by a duly authorized representative of the Company, but in no event shall there be less than 36” of covering over such water mains. All workmanship, material and installation of said water mains shall be subject to the approval and acceptance by a duly authorized representa­tive of the Company. 3* To stake water lines