Information
Digital ID
upr000194-069
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.??V M O K I M June 8# 1954 Statement showing percentage of total water flowing through Charleston Reservoir which is pumped through meter serving Elevated Steel Tank for period shown? Sate T I T " Total Flow Thru Charleston Res* Fer Pay-lg4.iir). ________ MOD ( 2) Total Flow Thru Charleston Reservoir 10Q0 Gal. Flow Thru Meter 10T0o0 TaGnakl V (4) 133 6? 93 116369 -JSL % of Total Flowing Thru Meter to Tank Per Cent Totals 6.937 % of Total Flow per day (Col 3 & 4 over Col 2) June 2, |||§ 4 PM to 5 PM I • 7 ** 8|| *ti 6 *» g7 s»* 109 rt * % of Total Flow per Pay (Col 3 & 4 over Col 2) (3) June 1. 19S» 4 PM to 1 PM 395 56 ? 61 8 350 7 « 8 1* 441572 98 «• 9 * 530 10 « ,, 297 244l 35.18* 447 I4 12 391 J Z L 33.03* 637 9.18* 14774 82 83 83 - M . 8.54$ (51 Col 4 over Col 3 3139..6174 20.58 3313..3323 ?IB 26.10 32.88 1199..8012 20.14 21.23 .21.54,,, Totals 7.572 2431 558 22.95 * of Total flow per day (Col 3 & 4 over Col 2) 32.10* ?.3?X June 3. 1954 54 P«* M to i5 P»M 444419 115474 34.97 6 1 7 » 104 2332..4625 7 « 8 * 418 82 19.62 89 «1 109 "8 403 82 20.35 38? 88 22.74 Totals 7.696 2542 657 25.87