Skip to main content

Search the Special Collections and Archives Portal

upr000188 105

Image

File
Download upr000188-105.tif (image/tiff; 25.44 MB)

Information

Digital ID

upr000188-105
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    % . — SHEET TWO— 199-13VG WE HAVE BEEN ADVISED PIPE LINE UNDER CONSTRUCTION AND RESERVOIR WILL BE READY WITHIN 60 DAYS, BUT IT IS OUR VIEW WILL BE AT LEAST 90 DAYS* AT PRESENT TIME WE HAVE IN MCNEIL SERVICE 9 OUTFIT WATER CARS OF •AUGHT" SERIES AND 18 STANDARD WATER CARS. IN ENGRS LTD SERVICE WE HAVE 5 OUTFIT TANK CARS AND 5 OLD ENGINE TENDERS, WITH INCREASED DEMAND FOR WATER WE SHOULD HAVE TEN MORE CARS FOR THIS SERVICE AND THEY SHOULD BE CARS IN GOOD CONDITION, WITH GOOD VALVES AND FREE FROM LEAKAGE. X-145. HHL.