Information
Digital ID
upr000188-105
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.% . — SHEET TWO— 199-13VG WE HAVE BEEN ADVISED PIPE LINE UNDER CONSTRUCTION AND RESERVOIR WILL BE READY WITHIN 60 DAYS, BUT IT IS OUR VIEW WILL BE AT LEAST 90 DAYS* AT PRESENT TIME WE HAVE IN MCNEIL SERVICE 9 OUTFIT WATER CARS OF •AUGHT" SERIES AND 18 STANDARD WATER CARS. IN ENGRS LTD SERVICE WE HAVE 5 OUTFIT TANK CARS AND 5 OLD ENGINE TENDERS, WITH INCREASED DEMAND FOR WATER WE SHOULD HAVE TEN MORE CARS FOR THIS SERVICE AND THEY SHOULD BE CARS IN GOOD CONDITION, WITH GOOD VALVES AND FREE FROM LEAKAGE. X-145. HHL.