Skip to main content

Search the Special Collections and Archives Portal

upr000186 163

Image

File
Download upr000186-163.tif (image/tiff; 26.87 MB)

Information

Digital ID

upr000186-163
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Las 7agas - March 5, 1953. W 23-111 Mr* C.M, Cory - Las Vegas CC: Mr. Wm. Reinhardt Mr. l.E. Bennett Will you please prepare usual for® of refund agreement with Lee Construction Company, Inc,, a Nevada Corporation, with place of business at 1501 Sweeney Avenue, Las Vegas, Nevada, covering construction of oast iron water mains and fire hydrant connectloss to serve approximately 9670 LF of 8“ and 6M cast iron water mains, and approximately 100 LF of 6n cast Iron fire hydrant connections to serve Eastwood Tract No. 1, as per map recorded in Book 3, Page 80 of Plats, Clark County, Nevada, Records* Location of said water mains and fire hydrant connec­tions are Indicated on attached map (9 copies attached for use in preparing agreement)• Subdivider agrees$ 1* At its own expense to furnish all necessary materials and labor and to constructs (a) Approximately 2830 LF of 8** and 6850 LF of 6M cast iron water mains* (b) Approximately 100 LF of 6M cast iron fire hydrant connections. The cost of constructing said water mains (exclusive of the cost of constructing the said 100 LF of cast iron fire hydrant con­nections) Is agreed to be the sum of 134640.00. 2. Said water mains shall be constructed of 8" and 6° cast iron pipe and shall be In accordance with AfWA specifications. All Joints shall be cement and all pipe shall be new BBS east iron, equal to AWWA Class 150* All fittings shall be new, all bell cast iron equal to AWWA Class 150, and all valve boxes shall be of cast Iron of appropriate sixe for each valve. Unless otherwise approved by a duly authorised repre­sentative of the Company, all pipes, valves and