Skip to main content

Search the Special Collections and Archives Portal

upr000184 169

Image

File
Download upr000184-169.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000184-169
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

b m Veg&s - October 10, 1952 Mr. 0, H» Cory » Las Vegas ool Mr. Msi# Beinhardt Mr, 1« E, Bennett will you pleas# yapep&re usual fans of refund agreement with Mr, Chris H. Aadliok and Myths V, Radllek, M s wife, of 2X40 faftM&sc Bead, Las Vegas, Nevada, covering the Construction approximately 12 5C LF of 6M o&st iron water spihi to serve Badlick Park Estates, L&s Vegas, Nevada, in as followsi location described Con&eneing at a connection with existing lo* oast iron water main in Oakey Boulevard at the intersection of South 7th Street, them® northerly in said South ?th Street to Bracken Avenue a distance of approximately 510 feet, thence easterly in Bracken Avenue to the centerline of South 8th Street & distance of approximately 350 feet, Ooaraenoing at a connect!an with the proposed 6* water main to be constructed in Bracken Avenue hereinabove provided at a point approximately 200 feet west of the ©enter lint of South 8th Street, theme northerly approximately 4c feet to an end, and Commencing at & connection with the proposed 6" water main to be constructed in South ?%h Street ae hereinabove provided at the intersection of Griffith Avenue, thence easterly in Griffith Avenue to the centerline of South nth street a distance of approact* la&tely 35-. feet. Together with the installation of approximately 16 feet of 6** oast iron water main to- serve two fir® hydrants in location as designated by City Authorities, The estimated cost of constructing said water cains and fire hydrant connections is i5,350.00, SuMividers Agree* 1* To deposit the sum of #5*350*00* 2. To locate pipe lines, 3, To furnish easement® where necessary, Oompany Agrees! le Upon execution -of Agreement, receipt of said deposit and necessary easescuts to proceed with the obstruction of said water mln.m®, fir® hydrant connection.