Skip to main content

Search the Special Collections and Archives Portal

upr000180 215

Image

File
Download upr000180-215.tif (image/tiff; 26.98 MB)

Information

Digital ID

upr000180-215
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Las Vegas - August 16, 1953. M3*« $to* Heinhardtl Referring to attached clippings shortage August 15 A 16* 1951* concerning water About 8120 P*M*tAlliest X4th, tie had a power failure caused by a blown fuse on the Power Company side of our sub* station as a result of which our 3-phaae circuit was single f based* fh » fuse was replaced and power service resumed about 100 P*H* All power equipment was reset and' normal operation resuned exospt pun© motors on veils nos* 5 and 3.0* fhe condi­tion at veil Ho* $ was easily corrected and operation restored but It was found the short circuit had burnt out motor on w e ll Ho* lo - necessitating removal* shipment to Los Angeles for repairs and reinstalling which was completed about IDS00 this morning* Following resumption of service the watchman on duty fa ile d to take in to consideration our reduced production but continued to maintain normal pressures throughout the night and as a re s u lt the re se rvoirs were aprrojclri&tely h a lf empty by 10*30 A*M* * August 15th, and lo sin g about $* per hour before we were advised of the s itu a tio n . When a fte r f ir s t reducing pressures the withdrawal continued to exceed our production, I requested the lo c a l radio stations to broadcast an appeal to the pu blic to discontinue a l l sp rin k lin g during the balance of the day and in general the pu blic responded wholeheartedly as our consumption was reduced from 16*500,000 gallons on August 14th to 14*495,*000 fo r August 15th* However, by of30 F*M* the Charleston re se rvo ir was empty and we had only g ra v ity flow* As a re s u lt the area along Charleston west of the Hospital was p ra c tic a lly without water* Even w ith the reduced production* I fe e l we could have furnished reasonably adequate service had the watchman on duty used any Judgment by reducing the pressure at the Charleston Reservoir a fte r midnight* August 14th* fro® usual operating pressure of 30-33 lbs* to 8-10 1he* which would have restated in a substantial quantity of water being stored fo r August 15th* The watchmen have repeatedly been requested to reduce pressures a fte r the heavy withdrawal periods* p& rticta& rly a fte r midnight when i t can be done sa fe ly and w ithout detriment to our service but i t appears impossible to obtain any re a lis tic understanding of the situation* I t fu rth e r appears our pumping- equipment should be so protected th a t, as in th is instance* a blown out fuse cannot single phase our operating c irc u its and bum out our pimping equipment motors# Z have discussed this situation with Division Engineer Martin, who will be here Monday to investigate the matter and X will advise you results* w* He Johnson