Information
Digital ID
upr000180-209
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.x m m x m m x m x x x Mr, C, Van Patton || The contract will further provide for refund of 50$ of the revenuea derived from sale of water to consumers located within the area above referred to taking service from the lines installed hareunder, during the ten year period following the completion of the installation* 3y actual cost la meant the cost of all material and au plies delivered to the job. the cost of all labor employed in connection with the installation of said water main* the cost of eremite? on contractor’s surety bond, public Liability, Property Damage and Contractor’s Contractual Liability Insurance, plus 10$ for supervision and overhead* Very truly yours, Secretary