Information
Digital ID
upr000179-121
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Hr* i»* A. m t n Las Vegas - lieveaber 1 7* 195© If 23-1-68 < 00 - &r* R* L. Masson Work Order 6**9 authorized the construction of pipe line to serve tbs south half of meek 2 and norm half of Slock 3* Scuthrldge Addition* for Scutfaridge Development Co* at an ©stinated east of $>*765* which the Subdivide** advanced under 0A»10560* Ensiled Is Detail of Charges to this Work Order indicating total cost to be l3»932.7o plus lSS*3ft for fire hydrant tee, to which shobld be added lip for e^pervisien and overhead* making total coat to Subdivide!* t&*3**7*57* We ariose fora 183 for refund of the difference #&?*$3* The total refundable under this contract Kill be #b*326*03. Following is data for depreciation purposes* i* Pipe* 306> H ,0 b8 .6 ? 6* Pipe* 1 0 W 2*923*6? Servloe nunbers 10297 to 10330 inclusive are assigned this contact* For Kr« Adaason’e infortaatlon in (^spiling •As Constructed* print* the Installation followed lines of print attached to Work order* JU M. Fdgsr