Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
Mr. L. A. Whitei Las Vegas - January 17, 1949 W 23-1-24 W 23-1-55 Xour letter January 15, file S© 9-2-4, regarding deposits of estimated costs covering pipe line extensions wader Work Order 612 540 and Work Order : Our Mora 183* #$-939* in the amount of |154*25* covered refund of difference between actual and estimated costs under C/A 10472 and should have been made payable to Masteroraft Homes, Ine* We submit corrected Mora I83. With reference to the refund of $147,72 under C/A 10475* covering conetruetion of water main under W0-612 S the check was issued by Reuben Speck tor; however, the contract covering the refund Is drawn with Richard Toleno and we therefore made the refund payable to him In accordance with the terms of the contract, As a matter of information, Specktor is financing the houses being constructed by Toleno and the contract was drawn with Toleno at their request. With reference to the last paragraph of your letter, I do not believe the value of the 8-inch pipe authorised under wo-540 should be dropped from the annual carryover* While it is true that the 8-inch line was constructed under another Work Order {W0-608) we expect to construct additional 6—inch line in Charleston Square Tract #2, possibly in February, and due to Increased material costs we will need all or most of the money authorised, I therefore recommend that the unexpended balance of $11,431*14 In WO-540 be included in the annual carryover. A. K. Molger