Skip to main content

Search the Special Collections and Archives Portal

upr000163 36

Image

File
Download upr000163-036.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000163-036
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    TABLE OP CONTENTS Page I. INTRODUCTION Purpose and Scope of Investigation 1 II. HISTORY OP COMPANY 1. Historical Background 2 2. Corporate Organization 2-3 3. Management 3 -4 III. PRESENT OPERATIONS 1. Extent of Service 5 2. Growth 5-6 3. Plant Facilities 7-8 3-a. Map Showing Properties and Service Area 8-a 4. Change from Railroad to Utility Use 8-9 5. Rates 9-11 5-a. Chart A, Average Yearly Water Bills, 1940-1949 11-a 6 . Conservation of Water 12 IV. FINANCIAL STATEMENT 1. Introduction 13 2. Balance Sheet, December 31, 1949 14 3. Income Statement, year ending December 31, 1949 15 4. Profit and Loss Account - 1949 15 V. V. RESULTS OP OPERATION 1. Revenues (Table I) 16-18 2. Expenses (a) Discussion by Accounts 18-25 (b) Joint Facility Rents 25-28 (c) Taxes 28-29 3. Fixed Capital and Rate Base (a) Bases Used 30-31 (b) Fixed Capital 1. Land 31-32 2. Improvements 32-33 3. Water rights 33-37 (c) Rate Base 37-38 (d) Depreciation Requirement 1. Reserve requirements 38-40 2. Annual depreciation expense requirements 40 (e) Advances in Aid of Construction 40-42 4. Summary of Results of Operation 42-43