Information
Digital ID
upr000162-129
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.24 TABLE X ESTIMATED CAPITAL ADDITIONS YEAR 1951 PRODUCTION COMPANY: (L»A.& S.L.R.R.Co.) Pipe line to connect Westleigh. Tract Pumping station and pipe line to serve West Side District Install pumps in Wells Nos. 8 , 10 and 11 Install automatic electric starting and timing controls at "booster stations and wells Install telemeter equipment and circuits to record water level In reservoirs and pressures In L.V.L.& W.Co® water mains Total Estimated Net Capital Requirements 2,110 J 3 & dO 18,800 4,000 v 4,000 (a S’ 7i£o O