Skip to main content

Search the Special Collections and Archives Portal

upr000139 233

Image

File
Download upr000139-233.tif (image/tiff; 26.88 MB)

Information

Digital ID

upr000139-233
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    (b) approximately 435 lin. ft. of 6n cast iron fire hydrant connections; installation of 9 fire hydrants (to be furnished by Authority); 15 serv­ice connections, including the in­stallation of valves, but excluding the valve boxes, 4,830.; 2 - Utility to refund to Authority quarterly 50^of monthly revenue received by it from custom­ers, including the Authority, located with­in the housing project, taking water from the water mains so installed, for period of ten years from the date of completion of said in­stallation, or until Authority has been repaid the actual cost of constructing the water mains referred to, whichever occurs first; 3 - Utility to own said water mains, fire hydrant connections and service lines; 4 - Authority to furnish Utility satisfactory easements where pipe lines are to be laid in other than dedicated streets and alleys; be, and the same is hereby, ratified, approved and confirmed. On motion duly seconded, it was RESOLVED, that the action of Vice President Reinhardt in executing letter-agreement C. A. 10597 (MN nLD 2489), dated July 17, 1951, with Nevada Construction Company, covering con­struction and laying of approximately 5,000 lin. ft. of 6 ” and 8” cast iron pipe, to serve Blocks 1 to 4, inclusive, of Stewart Addition, Las Vegas, Nevada; consideration $10,225, plus actual cost of premium on surety bond; be, and the same is hereby, ratified, approved and confirmed. On motion duly seconded, it was RESOLVED, that the action of Vice President Reinhardt in executing rider, CLD No. 10517-1, dated July 27, 1951, ex­tending to and including August 31, 1952, term of lease agree­ment Audit No. 10551, dated August 31, 1950, expiring August 31, 1951, with Nevada Outdoor Advertising Co. Inc., covering