Skip to main content

Search the Special Collections and Archives Portal

upr000139 50

Image

File
Download upr000139-050.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000139-050
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V hydrant to serve Moss Tract No. 2, parcel 1 and Lots 1-10 of Block 2, being developed by M. P. L. Corporation. Total estimated expenditure #5990, chargeable to Investment in Water System - Las Vegas, Nevada. A. F. E. No. 19 (W. 0. 752) Issued August I4., 1953» Las Vegas; construct 125 ft. of 8” and 1290 ft. of 6” cast iron water mains and 136 ft. of 6” cast iron fire protection laterals for 2 hydrants to serve Van Patten Tract No. 1 being developed by Desert Development, Inc. Total estimated expenditure #5,5^0, chargeable to Investment in Water Systems - Las Vegas, Nevada. A. F. E. No. 20 (W. 0. 753) issued August if, 1953» Las Vegas, Nevada; replacing 610 ft. of 8" cast iron water main on south side of Charleston Boulevard with 920 ft. of 8” cast iron water main.on north side of Charleston Boulevard between 1 3 th and 15th Streets account City vacating a portion of Charleston Blvd., between 13'th and 1 5 th Streets necessitating relocation of water main to a position within limits of remainirg dedicated area of Charleston Blvd. Total estimated expenditure $6 ,14.10 of which #6,310 chargeable to Investment in Water System - Las Vegas, Nevada, and $100 to Operating Expenses, less $l,61f0 credit to Investment in Road and Equipment for value of Property to be Retired which is chargeable to Accrued Amortization. W. 0. 75U> issued August 10, 1953* Las Vegas, Nevada; con­structing 2lf0 ft. of 6" cast iron water main and 12 ft. of 6* fire protection lateral for one hydrant in the alley east of Eleventh Street between Bonneville Avenue and Garces Avenue to serve Lots 1 to 7 and Lots 17 to 23 of Pioneer Heights Addition. Total es­timated expenditure #1,098, chargeable to Investment in Water System - Las Vegas, Nevada. 13-