Information
Digital ID
upr000115-125
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.1 Los Angeles, January 9, 1952 20-334-1 Mr. W. H. Johnson - Las Vegas (cc Mr. William Reinhardt) Your letter January 3» 1952, file W 13-6-2, requesting statement ©f water production and consumption at Las Vegas: Attached are two statements, one showing production and consumption by months for the year, and the other statement showing gallons of water sold and used at Las Vegas during the year. The follow ing changes a ffectin g the number o f feet o f water transmission mains during the year 1951 in Rail road Accounts West o f the track in Las Vegas occurred: W.O. 4597. Installed £00 mote control liGnPeM, boono s1t2enr tpruemapt eda ndw arteerline to furnish water to Diesel Passenger Locomotives. Completed 2-15-51* R0E&E Total # 5133.95 I W.O. 4739. Constructed booster pumping station , including 2 pumps, 2364 f t . o f 14” tran site pipe, 44 f t . 14” steel pipe, 54 f t . 12n cast iron pipe and 12 f t . 3” C. I . pipe water lin e to connect LVL&W Co. proposed lin e in Bonanza Road. Completed 11-30-51. (Accounting not complete) | 36&30.00 (Estimated) 0E 220.00 ” Total # 370$0.50 n