Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
More Info
Rights
Digital Provenance
Publisher
Transcription
Los Angeles - Feb* 10, 1953 20-334-1 Mr* L* R* Maag” - wLas Vegasr (GC - Mr* William Reinhardt) f XVS V f 1 Jj#f ;r | M ,/ J jr . , file * 1 con- ^ lib sumption at Las Vegas fo r the year 1952: Attached are two statements, one showing production and consumption by months fo r the year, and the other statement showing gallons o f water sold and used at Las Vegas during the year* The follow ing changes occurred a ffectin g the number o f fe e t o f water transmission mains during the year 1952 in Railroad Accounts west o f the track in Las Vegas: WO-4759: Constructed booster pumping station including two 1 pumps and 2364 ft* 14” tran site pipe 44-5/12 f t ; 14” steel pipe, |>4Vft* 12" cast iron pipe and 12 K ft* 5" G*I. pipe water lin e to connect withLVL&W Co* proposed lin es in Bonanza Road to serve west side d is tr ic t at Las Vegas* Completed 11-30-51* R&E $ 33910.54 OE 509*56 Total $ 34720.10 (Note: Above reported fo r inclusion 1951 report but with estimated cost - R&E 136530 0E $220, tota l - #37050) W0-4725: Installed pump and motor on Wells Nos. 5, 10 and 11,N . >a£/ constructed 12*0* x 1640* cement block pump house ' on concrete flo o r and foundation* Rearranged power l circu it and existing piping connections at Las V egas/i^ " Completed 12-31-51* 1I R&E $ 16422.57 0E 2760*92 Total $19is3*?9 (Note: Above reported for inclusion 1951 report but with estimated cost - R&E $15020 0E $750, to ta l - $15500)