Information
Digital ID
upr000090-021
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.water through its existing Shop Well, located in the iwf of the sw£ of the NW£ of Section 34 in said Township, and/or through a well to be drilled by it within the present boundaries of its shop grounds. Should said railroad company make application to the State Engineer to change the point of diversion of said 2,5 e.f.s, of water from its Well No. 1 to said existing Shop Well, and/or to make application to said State Engineer for a new well to be drilled within the boundaries of said shop grounds, the District will not protest nor contest such application or applications. (c) Rights of way and easements for the pipe lines and power lines extending from the land described in (a) above over lands owned and held by you, the character, location and nature of said rights of way and easements to be subject to an agreement between Union Pacific Railroad Company, Los Angeles and Salt Lake Railroad Company and Las Vegas Land and Water Company as parties of one part, 3