Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
tar said completion remove from the premises of the Union Pacific the 24-inch cast Iron pipe line and the 16-ineh transits and cast iron pipe line shown in broken red and black lines on said Exhibit *An and restore the premises of the Union Pacific to the condition in which they were prior to such removal. The said pipe line when eo removed shall remain the property of the District. In the event the District shall fail to remove the said pipe lines within said six (6) months* period. Union Pacific shall have the right to remove the same, and the District agrees to pay to Union Pacific the cost to Union Pacific of such removal upon presentation of bill therefor. Section &. The District shall hava the right at any time prior to the expiration of the sixty (60) day notice hereinabove in Section 2 provided to notify the Union Pacific that It proposes to remove said pipe lines shown in broksn red and black lines on said Exhibit WA" at its sole cost and expanse and to construct new pips lines in lieu thereof. Within a reasonable time thereafter the District shall commence and thereafter diligently prosecute to completion the construction of said new pipe lines. Upon the completion of such new pipe lines the District shall forthwith remove from the lands of the Union Pacific said pipe lines shown in broken black and red lines on said Exhibit WA®. In the event the District desires to locate all or any part of said new pipe lines upon property of the Union Pacific, said pipe lines shall be placed in location shown by broken black and red lines between points marked D and K on Exhibit *AW and by broken red and white lines between points marked K and E and points marked Y and D on Exhibit *A*. Union Pacific agrees to grant to the District easements feet in width for the construction, maintenance and operation of said pipe lines in said locations. 6.