Skip to main content

Search the Special Collections and Archives Portal

upr000089 32

Image

File
Download upr000089-032.tif (image/tiff; 33.16 MB)

Information

Digital ID

upr000089-032
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    the surface of the lands to the condition existing prior to such removal* (e) Remove the pumping station now located at point HH. The District shall have the right to re­locate said pumping station In a new location shown In solid green square on Exhibit "A-1M near point R. Section 3. In the event the District shall not have commenced to construct the new pipe lines and removed the said existing pipe lines and pumping station as provided in Section 2 hereof within two years from the sale date and shall not have eom plated said work within two (2) years and ten (10) months subse­quent to the sale date, Union Pacific, after having given the Die trlct sixty (60) days' notice in writing of its intention to to do, shall have the right (a) to construct an adequate pipe line of a capacity equal to or exceeding that of the existing 24-inch cast iron pipe line and 16-inch transits and cast iron pipe line shown on said Exhibit WA-1M by broken black and red lines and of a type and size to be mutually agreed upon* and in the event the parties cannot agree upon the character of said pro­posed pipe line within ninety (90) days after said written notice, the same shall be constructed by Union Pacific of 39~lnch east iron or pipe of a similar character. Said proposed pips line shall be constructed in the location shown in broken red and white line between points marked A and V and V and K on said Exhibit "A-l". (*>) to construct a 24-inch pipe In the location shown in broken red and white line between points marked 1C and E on Exhibit "A-l” and an 8-inch pipe line In location shown in broken red and white lines between points marked Y and D on Exhibit °A-ltt, it