Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
Form 30-1 (First of intermediate Sheet) WORK ORDER AUTHORITY—Detail of Estimated Expenditures c. s. 5-30-60,000--U 2 3 SHEET________OF_______.SHEETS LAS VEGAS LAND AND WATER COMPANY -DEPARTMENT LOCATION: Engineering Las Vegas, Nevada' Relay approximately 2538’ -DIVISION Oot » 1 -193- miHta General Manager’: nt*» State— anager’s do 241-1 of 4" wood stave water pipe line with 4" and 6" east iron pipe line and lay 50* of 1" and 405$°" N.I.pipe service lines in Wardle Addition! relay 2530’ of 4 *46" wood stave pipe line with 4" and 6" east iron pipe line ,ren« ...... 54 ; c£ 1" and 278* of 3/4" G.I .pipe service linos and install 2 additional valves and valve boxee in Hawkins Addition. Install '14* of 4* oast iron pipe liatp eta* for Las Vegas Fire Dept. Valuation 8oction 'Department R. and E. ACCT. No. DESCRIPTION Hiking Add!ilea COST OF NRW PARTS TO RffPL kpl PARTS ST precaulked Cl .156 C .1 .p 4" r * « 6* H„B. gate valves S «» 6* CXP fittings and specials 4«t * » it m Valve boxes with covers Lead and oakum Arbitrary percentages COST AT CURRENT PRICES OF QUANTITY 6" wood atave pips 41* * it m 6" H.X* gato valves 4» W It M 6” CIP fitting’s ft special! 4* * ? « m Lead and jute Arbitrary percentages OPERATING SXPBNSg WORK U{;8 L.ft & 1342 ? * 2 Sa 1 " PARTS RETIRED <£23 0.49 0*34 70 3.86 Ditching, lay pipe and backfill Locating pipe line, trucking and supervision 1* galv* wrot steel pipe, valves and fittings renewed 3/4" galv. wrot steel pipe valves and fittings renswed Arbitrary percentages 3460 UNIT RETIRED L.ft Ea L.ft UNIT COST 0.80 0.52 23.70 13*86 0.55 LABOR MATERIAL OR TRANSPORTATION CHARGES 138 21 TOTAL CHARGEABLE TO INVESTMENT ACCOUNT 2 016 OPERATING EXPENSES 1 274 3 425