Skip to main content

Search the Special Collections and Archives Portal

upr000078 15

Image

File
Download upr000078-015.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000078-015
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Form 30-1 (First of intermediate Sheet) WORK ORDER AUTHORITY—Detail of Estimated Expenditures c. s. 5-30-60,000--U 2 3 SHEET________OF_______.SHEETS LAS VEGAS LAND AND WATER COMPANY -DEPARTMENT LOCATION: Engineering Las Vegas, Nevada' Relay approximately 2538’ -DIVISION Oot » 1 -193- miHta General Manager’: nt*» State— anager’s do 241-1 of 4" wood stave water pipe line with 4" and 6" east iron pipe line and lay 50* of 1" and 405$°" N.I.pipe service lines in Wardle Addition! relay 2530’ of 4 *46" wood stave pipe line with 4" and 6" east iron pipe line ,ren« ...... 54 ; c£ 1" and 278* of 3/4" G.I .pipe service linos and install 2 additional valves and valve boxee in Hawkins Addition. Install '14* of 4* oast iron pipe liatp eta* for Las Vegas Fire Dept. Valuation 8oction 'Department R. and E. ACCT. No. DESCRIPTION Hiking Add!ilea COST OF NRW PARTS TO RffPL kpl PARTS ST precaulked Cl .156 C .1 .p 4" r * « 6* H„B. gate valves S «» 6* CXP fittings and specials 4«t * » it m Valve boxes with covers Lead and oakum Arbitrary percentages COST AT CURRENT PRICES OF QUANTITY 6" wood atave pips 41* * it m 6" H.X* gato valves 4» W It M 6” CIP fitting’s ft special! 4* * ? « m Lead and jute Arbitrary percentages OPERATING SXPBNSg WORK U{;8 L.ft & 1342 ? * 2 Sa 1 " PARTS RETIRED <£23 0.49 0*34 70 3.86 Ditching, lay pipe and backfill Locating pipe line, trucking and supervision 1* galv* wrot steel pipe, valves and fittings renewed 3/4" galv. wrot steel pipe valves and fittings renswed Arbitrary percentages 3460 UNIT RETIRED L.ft Ea L.ft UNIT COST 0.80 0.52 23.70 13*86 0.55 LABOR MATERIAL OR TRANSPORTATION CHARGES 138 21 TOTAL CHARGEABLE TO INVESTMENT ACCOUNT 2 016 OPERATING EXPENSES 1 274 3 425