Information
Digital ID
upr000068-144
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.J A M E S M. M O N T G O M E R Y • C O N S U L T I N G E N G I N E E R • I S N O R T H O A K L A N D A V E N U E • P A S A D E N A 1. C A L I F O R N I A m S/19/S3 If HiJ G GbT JJkSS. Constnictioa B. 1?" CIP to strshgt-hen existing distribution sy steal f» #» CXP to strengthen existing distribution sorstori 1 » jjfelles elevate! water tan! 12 9’ high # SW cor* Sec. 36 Total in tin; tied Cor* at ruction Cost Contingencies (5*25$) Purchase of ex!® ting V ijtsr syst^S: fro-Tt Unim Pacific 2, a • Acquisition r.l -?ht e~of-'.ray, assegsonts, 188,200 40,400 134,400 $, 5,007,000 242,000 23500,000 50,000 Total acquisition end construction «ost» Total lg.cidgr.-te3 exoqngeg.. jEfdaigStegi. Engf neari ng Legal fees Bcasd aleotion, publicity and Bale Establish District office ***3 Staff Repayment of loan to county forking caultel I 7,619,000 325.000 25,000 10,000 25,000 50,000 100.000 535,000. ftvuinA 'Pr- *? » 1 V:i milCX 4.V' J. f 8,354s000