Skip to main content

Search the Special Collections and Archives Portal

upr000067 57

Image

File
Download upr000067-057.tif (image/tiff; 26.85 MB)

Information

Digital ID

upr000067-057
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

cc: Mr. L. R. Maag OFFICERS AND DIRECTORS A * C A M P B E L L PRESIDENT SPENCER L. BUTTERFIELD VICE-PRESIDENT W ILLIAM COULTHARD SECY,-TREAS. HARRY E. MILLER JAMES CASHMAN JOHN BUNCH LAS VEGAS VALLEY WATER DISTRICT 900 SOUTH 5TH STREET LAS VEGAS, NEVADA T elephone 5 9 2 0 November 7, 1953 Additions and Betterments to the Las Vegas Land and Water Company System ^-Jjnder the terms of our contract to purchase the facilities of the Las Vegas Land and Water (Q&om pany, it Is required that the Water District shall approve a ll expenditures exceeding a cost 11 W $2,000.00. Before the passage of the bond issue. It was felt that the Water District should | “Pprove expenditures after merely checking the reasonableness o f the cost of each project. Now *ha* toe bond ittve has been passed. It Is the feeling o f the Board of Directors of the District that these additions and betterments represent an actual expenditure of public funds. The Board njjs® Hiat *ho general rules o f competitive bidding on public projects should be followed r # future expenditures, in order to prevent any possible criticism which might be directed I *° ***• contact we request that evidence be submitted for each future project j that bids have been requested from at least three parties and that the rebate and cost to the w Water District be based on tho low bid. f. Montgomery has discussed with M r. M aag means by which this procedure might be carried ond we believe that It can be done without materially increasing either your work or ours. Very truly yours, LAS V EG AS VALLEY W A T B DISTRICT M r. Wm» Reinhardt V ico President Las Vegas Land & Water Company 422 West Sixth Street p jjo s Angeles, California v^ear M r. Reinhardt; By ________ Thomas A . Campbell President TACm ih