Skip to main content

Search the Special Collections and Archives Portal

upr000065 383

Image

File
Download upr000065-383.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000065-383
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Las*-Vega3 Land and Water Company First Revised Sheet PSCN No. 2 cancels Original Sheet PSCN No. 2 SCHEDULE OF BATES - Cont«d. Rate Rate per No. Class of Service Month 5- Blacksmith Shop (a) One forge -------------------- $1.10 (h) Each additional forge -------------- .60 6. Bottling Works ____________________ 10.00 7. Bowling Alley 1.65 8. Brick Manufacturer and Yard - clay, cement, gypsum, adobe or other material, per M brick ------------------ .13 9* Bungalow Court (Motel) (a) For first Unit ------------------ 2.25 (b) For each additional unit without kitchen ----- .85 (c) For each additional unit with kitchen ------- 1.15 (d) Water for lawns, trees, flowers and shrubbery on same motel lot 1 - First 1000 square feet of area included in rate for first unit of clansification 2 - For each llt-0 square feet or fraction thereof over 1000 square feet - - - .02 10. Bus Depot 3.OO 11. Butcher Shop ----------------------- 2.20 12. Cabin or Tent House (See No. 9> Bungalow Court) 13. Candy Manufacturer -------------------- 2.50 lit-. Church Free 15- Cigar Manufacturer -------------------- 2.20 16. Club Rooms - with bar but no sleeping quarters or dining room ----------------- 7.50 17. Concrete or Cement Work - per cubic yard --------- .05 18. Confectionery Store -------------------- 1.65 19- Confectionery Store and Candy or Ice Cream Factory Combined if-.00 Issued by Wm. Reinhardt Vice-President _ •De camber' 1, I95i Effective