Skip to main content

Search the Special Collections and Archives Portal

upr000062 103

Image

File
Download upr000062-103.tif (image/tiff; 23.68 MB)

Information

Digital ID

upr000062-103
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V CoL.D. No, 10555 THIS AGREEMENT made and entered into this 30th day of November , 1950 , by and between LOS .ANGELES & SALT TAKE RAIIROAD COMPANY, a Utah corporation, First Party, UNION PACIFIC RAIIROAD COMPANY, a Utah corporation, Second Party, both of said companies being hereinafter collectively called "Railroad Company", and LAS VEGAS LAND AND WATER COMPANY, a Nevada corporation, Third Party, hereinafter called "Water Company", WITNESSETHs Recitals First Party is the owner of certain real property herein­after called "water bearing lands" located in the City of Las Vegas, County of Clark, State of Nevada, outlined in Red color upon the map marked Exhibit "A" attached hereto and made a part hereof, and certain springs, water wells, pipe lines, reservoirs and other fa­cilities located upon said water bearing lands by means of which underground water is produced and saved from said lands® The First Party is the owner of pipe lines shown on Ex­hibit "A" through which water produced from said water bearing lands is transported and delivered into the distribution systems of First Party and of Water Company® The center line location of said pipe lines outside the boundaries of the water bearing lands is shown by green lines on Exhibit "A". Rights of way sufficient for the said pipe lines shown by green lines on Exhibit "A" consist of strips of land 20 feet in width being 10 feet on each side of the center line location of each of said pipe lines across property owned by First -1 -